ANNEX: PROJECT PLANNING FOR THE DESIGN OF GARDENS , PARKS AND
GREEN AREAS UNDER THE REGULATION AND GREEN CITYSCAPE OF ROME
CAPITAL
60The Regulations of the green and the cityscape of Rome Capital, not yet approved, lists in Art. B17
project materials to be produced for all green building.
Art. B17 - Elaborati progettuali
B17.1 The works comprising the Project and technical culture of accommodation to green , to be
presented to the Commission Green Areas , in accordance with the provisions of Leg. 163/2006 and
Regulation 207/2010 , must be made at least the following documents
•
technical report describing the intervention as a whole, the design choices scenery and specific
agronomic techniques that means taken. They must include: framing landscape; the state of
affairs and the rilievoplanimetrico appropriate scale; easement overhead and underground; the
assessment of any pre-existing trees; the arboreal subjects may be subjected to mechanized
transplanting; all details and the design objectives of both works of demolition or new
construction;
•
the technical specifications, which reference point can be derived from the specifications of
Roma Capitale and the technical requirements of the Maintenance of Public Green Ordinary in
force at the time the project or from those of New Works in Public Green or specific research
market, must contain the specific qualities of the plant material (trees, shrubs, ground cover,
seeds, etc.) that is meant to use, with precise specification of the sixth plant for each species of
plant chosen; the description of construction techniques and materials, facilities, furniture
means that adopt, etc.;
•
forecast of noise impact assessment in accordance with Law 447/1995 if necessary. This
document must be presented by the designer to the sector responsible;
•
bill of quantities of works, freight and supplies provided, making specific reference to the list
prices of Roma Capitale in force at the time the project or specific market research;
•
project tables, drawn up by the stairs more appropriate, according to the Legislative Decree
no. 163/2006 and Regulation 207/2010, it is necessary to better illustrate the works as a whole
(the inclusion of the project in the urban green system Legacy), the construction details and
the impact of non-permeable surfaces provided by the project. In plan view, all arboreal
subjects present or expected to be necessarily depicted with a circle that simulates scale the
average diameter of the canopy at maturity. It must be also drawn up the plan of the automatic
irrigation and a report on the automatic sprinkler systems including tank and electrical
systems;
•
photographic documentation certifying both the state of affairs of the areas during any pre-
existing trees and adequate rendering to illustrate the project proposal;
•
maintenance plan, considered as a technical management and conformed to the management
in place at the OU Management Public Green. The specific references can be taken from the
specifications and the technical requirements of maintenance. Ordinary Public Green in force
at the time the project. The maintenance plan must be prepared by a qualified engineer in the
field of green, to the extent permitted by applicable law;relazione conclusiva delle proposte di
progettazione partecipata con i cittadini.
•
final report of the proposed participatory planning with citizens.